Campuses sized for the compute AI needs.
AI workloads draw more power per rack, run hotter and scale faster than traditional IT. We plan every site around that from day one: the grid connection, the cooling and the building are designed together.
Power and grid
Site selection driven by available capacity, high-voltage connection, and integration of on-site generation and battery storage.
High-density halls
Data halls laid out for GPU clusters, with the floor loading, power distribution and cabling that dense racks require.
Liquid cooling
Cooling systems designed for direct-to-chip liquid cooling alongside air, so halls can follow the hardware as it changes.
Design and build
One team from concept design and permitting through construction, commissioning and handover to the operator.